. . .
" class="" alt="Air Field Facilities (3)" />

Air Field Facilities (3)

Project Description

El Seif role was the main contractor and contract consisted of engineering, procurement and construction of site development works and testing & commissioning.

Scope included all civil works and military structures (aircraft shelters) as well as supporting buildings, the scope of this work included all formwork, reinforcement and concrete together with the supply and installation of all cast in items, with all MEP works and defense systems.

Project Details

Project Name: Air Field Facilities (3)

Clients: Royal Saudi Air Force

Location: Khamis Mushayt, KSA

Duration: 1985-1989